CALL US: (702) 736-7770

  • Home
  • About Logic LLC
  • Project History
  • Case Studies
  • Our Team
  • Contact Us
 
cal_rooms
February 10, 2017

California Hotel West Tower Rooms Remodel

admin Case Studies 0

470 typical hotel rooms at the California Hotel and Casino went through a complete remodel including bathrooms with tub to shower conversions. The remodel was completed in 14 weeks including corridor and elevator lobbies.
 
1 2 3 4 5 6 7 8 9 10 11 12 13
[Show thumbnails]
Ondori Restaurant at the Orleans California Hotel West Tower 23rd Floor Suites Remodel

Related Posts

Case Studies

Orleans Hotel Casino Buffet

Case Studies

California Hotel East Tower Rooms Remodel

sig

Case Studies

California Hotel West Tower 23rd Floor Suites Remodel

Leave a Reply Close

Case Studies

  • Orleans Hotel Casino Buffet
  • California Hotel East Tower Rooms Remodel
  • California Hotel West Tower 23rd Floor Suites Remodel
  • California Hotel West Tower Rooms Remodel
  • Ondori Restaurant at the Orleans
  • Alder & Birch Steakhouse
  • Jeff Mitchum Gallery of Photographic Art
  • Cornerstone at the Gold Coast
Logic LLC
NV Lic # B-0070943 | License Monetary Limit: Unlimited
Logic LLC, Building Contractors, Las Vegas, NV
Copyright © 2025 Logic LLC. All Rights Reserved.
Website design by Las Vegas Web Solutions

Location

3200 Polaris Avenue, Suite 21
Las Vegas, NV 89102

(702) 736-7770