California Hotel West Tower 23rd Floor Suites Remodel
In four weeks Logic remodeled 23 suites in the West tower. This included complete demolitions of all floor finishes, wall covering, and complete bathroom demolition. The existing SK suites, Mini suites, and Super suites received a new floating wall to separate the living room from the bedroom giving them a modern look. In all bathrooms, the existing tubs where removed and replaced with walk in showers.